Concrete Reception Desk at Goat Yard – London

Project: Manufacture and installation of a concrete reception desk at a newly refurbished office space.

Client: West 1

Location: Goat Yard, Albion House, London Southwark

Materials used: Hand cast and sprayed glass fibre-reinforced concrete (GFRC) in a Mist  Pitted finish with laminated joinery

Timescales: 8 weeks

Description

Goat Yard, formerly a Victorian Warehouse building named Albion House, underwent comprehensive refurbishment to offer grade A office accommodation, totalling 30,484 sq ft. Refurbished by West 1, a leading high-end office fit-out Contractors, the building boasts a newly reconfigured reception area. The Living Concrete team were commissioned to cast and install a custom-build concrete reception desk.

Spanning 3m long, the single cast was made offsite, without any joints and finished in Mist Pitted finish to resemble a real, cast in-situ concrete. Laminated grey joinery and black Forbo rubber-lined worktop completed the look.

    Enquire about this product

    Product Name

    Your Name (required)


    Your Address

    Your Specification (required)

    *For products with options you must specify only one option

    Your Message (required)

    What best describes your interest in concrete? Please choose from the options below:
    Professional/ArchitectConsumer/Home Owner

    [mc4wp_checkbox]

      Request a quote

      Please fill in the below form and we will get back to you as soon as possible.








      Drawings Upload:
      Add Files (Design drawing, sketches etc. - 10MB file limit)

      Installation Type:
      Supply OnlyInstall Team




      What best describes your interest in concrete? Please choose from the options below:
      Professional/ArchitectConsumer/Home Owner

      Thank you for your enquiry. One of our team will respond to you within 48 hours.
      Kind regards, Living Concrete Team

      [mc4wp_checkbox]