New Reception, Entrance & Cafeteria – Microsoft, Cambridge

Project: Manufacture and installation of Plain Wall Panels with invisible fixings brackets in Rough Mist finish for both the reception area and cafeteria area at Microsoft’s offices in Cambridge.

Client: ISG Builders

Location: Cambridge Science Park

Materials used: Standard large size bespoke GRC Plain Wall panels treated with hydrophobic agent and clear sealant

Timescales: 8 weeks

Description

On this project we teamed up with construction specialists ISG Builders, to design and fit new entrance and reception areas and a cafeteria room at Microsoft’s world-leading research facility in Cambridge Science Park.

To create an impressive industrial look, the glass fibre reinforced bespoke concrete wall panels were installed by our team on site. We used our unique eco concrete mix technology and each panel was treated with our hydrophobic agent and clear sealant. The individually sized panels were fixed to vertical walls using specially constructed timber and plywood frames and secured with invisible fixing brackets.

    Enquire about this product

    Product Name

    Your Name (required)


    Your Address

    Your Specification (required)

    *For products with options you must specify only one option

    Your Message (required)

    What best describes your interest in concrete? Please choose from the options below:
    Professional/ArchitectConsumer/Home Owner

    [mc4wp_checkbox]

      Request a quote

      Please fill in the below form and we will get back to you as soon as possible.








      Drawings Upload:
      Add Files (Design drawing, sketches etc. - 10MB file limit)

      Installation Type:
      Supply OnlyInstall Team




      What best describes your interest in concrete? Please choose from the options below:
      Professional/ArchitectConsumer/Home Owner

      Thank you for your enquiry. One of our team will respond to you within 48 hours.
      Kind regards, Living Concrete Team

      [mc4wp_checkbox]